Nigde

The exploration licensed mineral deposit covers an area of 321 hectares. The deposit is discovered during the highway construction in 2012. The government highway organization was splitting several hills up to 7 metres and as a result of the chemical analysis of the samples taken from this points, the ground contents 13-30gr/ton Au and 30gr/ton Ag from 5 metres including 1 up to 6gr/ton Pt and up to 31% Sr

STATUS OF NIGDE DEPOSIT
Project Name Nigde
Address Nigde city, Bor town Turkey
License Exploration licensed (321 hectares)
Reserves 6.750.000 visible and 31 million ton probable ore
Grade Au 13g/t ,Pt 2g/t,Ag 30gr/ton, Sr 25%
Planed production volume 2000 ton/day ore
Operation type Open pit
Final product Au,Ag,Pt concentrate
Production Start 6-8 months
Cooperation type J.V or Production share agreement